Bid Bond
Backs your promise to sign the contract and provide required award bonds if you win.
Wyoming · Project bonds
Wyoming maintenance bonds back specified repairs after construction. Public owners and private commercial contracts can require warranty security; the amount, period, and accepted form come from the applicable project documents.
Year 1 has no charge. The second year of a two-year period is estimated at 3% of the bond amount, with a $100 minimum premium.
3% of a $10,000 bond, with a $100 minimum premium. Only the second year of a two-year maintenance period is charged. Periods longer than two years are not available. This is an estimate, not a quote. Final approval and pricing are subject to underwriting.
Get my exact priceWyoming overview
For a Wyoming maintenance bond, start with the written warranty and acceptance requirements. A correction obligation, retained performance security, and a separate maintenance bond are different arrangements. Confirm which the owner accepts before requesting a bond.
Wyoming maintenance and warranty security is tied to a specific project. Use the owner’s actual repair obligation and accepted security rather than assuming that every job needs a separate bond or a standard percentage.
A Wyoming maintenance bond backs the contractor’s specified obligation to correct covered defects in materials or workmanship after construction. The contractor is the principal, the named protected owner or general contractor is the obligee, and the surety responds under the accepted bond.
Read the bond and contract together for exclusions, notice, repair opportunities, and the guarantee period. A construction defect warranty is not automatically a promise to fund routine upkeep, normal wear, or every equipment manufacturer’s warranty. Performance completion and labor/material payment bonds serve different obligations.
For municipal improvement contracts governed by W.S. 15-6-302, the bid notice states whether the contractor must maintain the work for a specified period, up to five years. A maintenance bond is furnished at contract signing if required by the governing body.
The statute allows the guarantee and maintenance bond to be a single instrument. It does not make a separate maintenance bond mandatory on every Wyoming project or establish one penal sum. A required period over two years is outside our program.
W.S. 15-6-302 can permit a municipal maintenance obligation longer than our two-year limit. Our program does not write three-, four-, or five-year maintenance periods. Review the actual notice and accepted instrument with the owner and surety before applying, including whether the guarantee and maintenance security are combined.
A private commercial owner or general contractor in Wyoming can require a separate maintenance or warranty bond through the construction agreement or subcontract. Confirm the protected party, covered work, amount, start event, and any lender conditions; a municipal subdivision example does not set a private project’s terms.
A commercial warranty clause can require repairs without requiring a separate surety bond. Ask whether the owner accepts an existing performance bond, retained security, or a specifically worded maintenance instrument; do not assume one form substitutes for another.
Provide the municipal bid notice, contract, governing-body bond requirement, approved amount, and required period. Meet the contract-signing delivery requirement and retain the owner’s start, inspection, and release records.
Keep the signed acceptance, inspection reports, punch list, warranty notices, repair records, and accepted bond. If a defect is reported, follow the contract and bond’s notice and response process and notify the surety. Expiration of a stated period does not by itself prove the owner has released security or that timely reported defects are resolved.
Provide the Wyoming project’s maintenance form or warranty clause, original contract and bond details, required amount, obligee, completion and acceptance records, and requested period. Identify any separate developer or subdivision approval obligation.
Have the surety review the exact wording and any original or electronic execution requirements. Deliver security to the recipient named by the owner and obtain acceptance. Do not cancel or reduce existing security until the owner has approved the replacement or release.
How it works
Request the written repair obligation, required form, amount, protected party, acceptance/start event, period, and release conditions. Confirm whether a separate maintenance bond or existing security is required.
Provide the Wyoming contract or subdivision agreement, original performance security if relevant, required maintenance form, and acceptance or inspection records.
Our program covers periods up to two years. Year 1 has no charge; only year 2 is charged for a two-year period, generally at 3% of the maintenance amount with a $100 minimum. Review underwriting and indemnity terms.
Provide the municipal bid notice, contract, governing-body bond requirement, approved amount, and required period. Meet the contract-signing delivery requirement and retain the owner’s start, inspection, and release records.
Cost
You pay only for the second year of a two-year maintenance period. Year 1 has no charge, and we do not consider maintenance periods longer than two years. The year-2 premium is generally 3% of the bond amount, with a $100 minimum premium and no minimum bond amount. Final approval and pricing are subject to underwriting.
Typical cost: Year 1 has no charge. Year 2 is charged.
Who to contact
Sources: Wyoming Legislature, Title 15, section 15-6-302. Requirements change. Confirm the bond amount, form, and deadline with your project owner or contracting agency before you buy.
Required by your state or city before you can get or renew a contractor license.
Backs your promise to sign the contract and provide required award bonds if you win.
Guarantees you will finish the project under the contract terms.
Guarantees you will pay your subcontractors, laborers, and suppliers.
No single requirement should be inferred from a named public project example. The contract, applicable public approval, and accepted warranty-security terms determine whether a separate bond, retained security, or another approved arrangement is needed. For municipal improvement contracts governed by W.S. 15-6-302, the bid notice states whether the contractor must maintain the work for a specified period, up to five years. A maintenance bond is furnished at contract signing if required by the governing body.
W.S. 15-6-302 can permit a municipal maintenance obligation longer than our two-year limit. Our program does not write three-, four-, or five-year maintenance periods. Review the actual notice and accepted instrument with the owner and surety before applying, including whether the guarantee and maintenance security are combined.
A private commercial owner or general contractor in Wyoming can require a separate maintenance or warranty bond through the construction agreement or subcontract. Confirm the protected party, covered work, amount, start event, and any lender conditions; a municipal subdivision example does not set a private project’s terms.
Year 1 has no charge. For a two-year maintenance period, only year 2 is charged, generally at 3% of the maintenance bond amount with a $100 minimum premium. There is no minimum bond amount. We do not write periods longer than two years; the owner must accept the required form and period, and final approval and pricing are subject to underwriting.
Wyoming maintenance bonds back specified repairs after construction. Public owners and private commercial contracts can require warranty security; the amount, period, and accepted form come from the applicable project documents.
You pay only for the second year of a two-year maintenance period. Year 1 has no charge, and we do not consider maintenance periods longer than two years. The year-2 premium is generally 3% of the bond amount, with a $100 minimum premium and no minimum bond amount. Final approval and pricing are subject to underwriting.
A maintenance bond guarantees a contractor will repair defects in materials or workmanship for a set period after a project is completed. The surety pays for repairs if the contractor does not make them.
The contract, applicable approval, and accepted bond set the period and start event. Completion, acceptance, dedication, or another specified event may control. Our program covers periods up to two years; we do not write longer terms. Confirm any fractional-year period, repair extension, and required release conditions with the owner and surety.
You pay for the second year of a two-year maintenance period only. The first year has no charge, so a one-year maintenance bond has no premium. The year-2 premium is generally 3% of the bond amount, with a $100 minimum premium. Final approval and pricing are subject to underwriting.
No. There is no minimum bond amount. The $100 minimum premium applies to the year-2 charge.
No. We do not consider maintenance periods longer than two years. If your contract requires a longer warranty bond, contact us and we will tell you what options exist.
Use the amount approved by the owner. Requirements can use a percentage of improvement cost, contract price, or the original performance security, or another approved amount. The penal sum is the coverage limit, not the premium; no single percentage applies to every project.
Defects in materials, installation, and workmanship that appear during the warranty period. Normal wear and owner misuse are not covered.
Yes. The terms are used interchangeably, along with defect bond.
Only if the contract requires a separate maintenance bond. The performance bond guarantees completion of the project, and the maintenance bond covers the warranty period after it. A one-year maintenance bond has no charge, and a two-year bond is charged for year 2 only.
Don't see your state? Contact us or browse all contractor bonds.